Kitchen Renovation in Playa Flamenca
We have been fitting kitchen renovation in Playa Flamenca for years, so we know the homes in the area. You get a fixed price before we start and the delivery date in writing.
Playa Flamenca is an area of developments from the eighties and nineties: square kitchens of about six meters, with a window to the patio and original furniture from the promotion. At that age, what usually fails are the hardware and the bottoms of the sink due to humidity. We usually propose a complete new kitchen taking advantage of the installations, which are generally in good condition.
If you have an old or deteriorated kitchen and want to change it, we handle the entire process of removing the old kitchen to install the new one. We take everything away, prepare for the installation of the new kitchen, and install it.
This kitchen type in other areas
When we say comprehensive renovation, we mean that we have solutions for everything. We enter with the kitchen set up and leave with the kitchen installed and functioning. We work with collaborating companies for all trades.
-
Disassembly and removal. We take out the old furniture and take the debris to the recycling point. We do not leave it in your hallway.
- Plumbing and electricity. We check the water and electricity connections. If changes or adaptations to the regulations are necessary, we have collaborating companies to do it.
- Furniture and countertop. Custom manufacturing, assembly, and adjustment on site, including the countertop.
- Appliances. If you want, we can install them and leave them connected and tested.
Closed budget: the price of the first day is that of the invoice.
The scare of a renovation is not usually the initial budget, it’s the extras that appear halfway through the work. We measure your kitchen before giving you a number, and that number doesn’t change unless you change something.
If when opening a wall something appears that couldn’t be seen — a damaged drain, an old installation — we show it to you, give you the separate cost, and you decide. You will never find it in the final invoice without having discussed it.
What the kitchens are like in Playa Flamenca
Most of the ones we refit are in terraced duplexes, from the nineties to 2010. They tend to be open to the living room and with a window, so we know what we are walking into before we come out to measure.
What we are asked for most is moving it to another room in the house. And one thing counts for a lot here: that a lot of the properties are holiday or second homes, so the work is fitted around the dates the place is free.
We work right across Playa Flamenca: Playa Flamenca Nicolás de Bussi, Playa Flamenca zona correos and the surrounding area.
How much does it cost to renovate a kitchen in Playa Flamenca?
It depends on the square meters, whether installations need to be modified, and the finish you choose. To give you an idea before calling us:
- Changing furniture without construction, white finish: starting from €250 per linear meter. Existing installations and tiling are utilized.
Consulting the price for your case costs nothing and does not commit you. Come on, we measure and give you the price.
Depending on the finishes you want, the price will vary.
Frequently asked questions
How long does a kitchen renovation take?
How long does it take to manufacture the units?
How long from accepting the quote to the fitting?
Can the quote change during the job?
What surprises can come up during a renovation?
What has to be decided before the work starts?
When is the final measuring done?
Who coordinates the electricians, plumbers, builders and fitters?
Do I have to be at home during the work?
Can the work be done while I am abroad?
Can you do a 3D design before starting?
Can a kitchen be designed entirely to measure?
How much space do I need around an island?
What is the difference between melamine, laminate and lacquer?
Which kitchen doors are the most hard-wearing?
Are pull-out drawers worth it?
How long does a good-quality kitchen last?
Are integrated appliances better?
Can I keep my current appliances?
Do I need an extractor hood if the kitchen is open-plan?
Can the washing machine and dishwasher be hidden?
Can the sink be moved?
Can the hob be moved?
Can the sockets be moved?
Do the tiles have to come off, or can the old ones be covered?
Can I replace just the units?
Can the kitchen be renewed without building work?
Can the doors be replaced while keeping the units?
Can I change only the countertop and the sink?
What does the quote for a kitchen renovation in Playa Flamencainclude?
Is the dismantling of the old kitchen included?
Is the removal of debris included?
How much does a countertop cost?
What warranty does the renovation have?
Is a work permit necessary in Playa Flamenca??
Can I stay at home during the work?
How long will I be without a kitchen?
How much does it cost to renovate a small kitchen?
Shall we talk about your kitchen?
Tell us what it is like and what you have in mind, and we will give you a first idea of the price within 24 working hours. No obligation, and no weekly sales calls afterwards.